beautypg.com

Installation, Eneral, Tandalone unit installation – OT Systems FT110DBE User Manual

Page 7: 3) installation

background image

FT110DBE Series Installation & Operation Manual

www.ot-systems.com

7

(3) Installation

3.1 General

All OT Systems products are thoroughly inspected, tested and securely packaged before

delivery to ensure a stable, intact and trouble-free service. Please check the equipment upon

receipt for any visible damage which may have been caused during shipping.

The FT110DBE Series standalone units (Fig. 3.1) can be either horizontally or vertically

wall-mounted, or mounted on any fixture. The Standalone unit works with an external power

supply FT-PA/12V powered by local 110/220V power.

The FT110DBE Series card modules are housed inside the FT-C18 rack-mount chassis (Fig.

3.2) with an included power supply unit. The whole chassis is powered by local 110/220V power.

FT-C18 is a

standard 19” (483mm) rack-mount chassis which occupies 4 rack units (177.8mm) in

height. Each FT110DBE card module occupies two slots and a total of 9 cards can be housed

inside the chassis.

3.2 Standalone unit installation

a)

Mount the standalone unit onto a fixture, (either on the wall or on a flat surface) with four

screws through the holes on the mounting frame to secure it in position.

b)

The provided power supply should also be mounted on the same fixture or in the proximity

for connection of the supply cables to the unit, provided that an AC power supply socket is

nearby for powering the adaptor.

c)

Connect all the signal inputs and outputs at the back of the unit with appropriate cables:

fiber optic cable for optical link, BNC cable for video input/output (Tx/Rx), UTP cable for data

input/output (Tx/Rx) and Ethernet cables for the Ethernet network or the Ethernet equipment

connections.

d)

Once the unit is powered up, check that the red POWER LED on the unit is lit. If not, check

the power supply cable connections between the unit and the power supply socket.

e)

With all the signals available at the input and output ports, check the status of LEDs located

on the unit. With correct status of each LED, installation is now completed [for LEDs status, see

Operational Guides

on this manual’s section (5)].

Fig. 3.1 Standalone unit

Fig. 3.2 FT-C18 chassis

This manual is related to the following products: