Ead2 - electric advance & drop v2 – Future Automation EAD2 User Manual
Page 9

In
st
all
at
io
n
: S
ta
ge
4
Page 8 of 18 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
EAD2 - Electric Advance & Drop V2
Cable routing
Bring the cables through the wall and the EAD2 wall plate. Loop around the
hinge tube allowing enough slack not to get caught or pulled taught.
Run the cables inside the arm and cable tie to the management brackets.
Bring the cable out though the exit hole and down to the screen.
Make sure there is enough slack from the screen to the mechanism to allow
for movement.
Section view
Wall Plate
Cable Management Brackets
Cable Exit Hole
Cable Route
Slack Required
Slack Required
Hinge Tube
Advancing Arm