Ebf - end bed flap – Future Automation UBL User Manual
Page 12

In
st
al
la
ti
o
n
:
S
ta
ge
7
Page 11 of 12 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
EBF - End Bed Flap
Test and run the flap
Plug the wiring loom into the
drive side as shown
Test the flap and make sure it
runs correctly and nothing is in
the path of the flap
NOTE - The UBL / UBLS will
NOT work until the EBF is
connected to the control box.
The control box requires 2
mains inputs, one to power
the EBF and the other to
power the UBL / UBLS.
This manual is related to the following products: