DynaScan Indoor 360 Degree LED Video Display DS0816 User Manual
Page 8
8
Step 7:
a) As shown in the diagram, do not completely set display on the light box.
b) Make sure the fiber cable are routed through the correct openings.
c) Connect the fiber cable.
d) Install the two alignment studs.
Wire opening
Transceiver
Fiber connection
(the fiber cable in
left picture
connection here)
Optical fiber
Alignment studs
Pass-through
for fiber cable
Temperature sensors
(Cable #1069)
Power cable connection
for control box.
Wiring openings
Pass-through hole
for upper light box
power cable