8 maintenance – Doremi ShowVault / IMB User Manual
Page 32
CRT.OM.001514.DRM
Page 32 Version1.7
Doremi Labs
8 Maintenance
8.1 Replacing the IMB Battery
Follow the procedure below to replace the IMB battery:
The battery must be replaced every 5 years. Battery information includes the following:
Manufactured Part Number: BR3032 from Panasonic
To replace the battery, apply the following procedure:
1.
Make sure you have all the required parts and tools as stated below:
a)
One screwdriver
b)
One plastic (non-conductive) Probe / Prying Tool
c)
Projector door key
d)
New IMB battery
e)
Specific projector's documentation explaining how to remove/insert the IMB
from/into the projector.
Figure 39: Required Tools
See also other documents in the category Doremi Video:
- AUD-D2A (13 pages)
- CaptiView (14 pages)
- ShowVault / IMB (27 pages)
- DCP to ShowVault Conversion Procedure (24 pages)
- DCP-2000 (10 pages)
- ShowVault / IMB (23 pages)
- DCP-2000 (11 pages)
- DSV-J2 (35 pages)
- ShowVault / IMB (33 pages)
- ShowVault / IMB (7 pages)
- DCP-2000 (4 pages)
- DCP-2000 (24 pages)
- ShowVault / IMB (276 pages)
- DCP to ShowVault Conversion Procedure (27 pages)
- ShowVault / IMB (16 pages)
- ShowVault / IMB (31 pages)
- ShowVault / IMB (40 pages)
- ShowVault / IMB (13 pages)
- ShowVault / IMB (146 pages)
- Asset Manager (15 pages)
- CineAsset (82 pages)
- Asset Manager (84 pages)
- AccessLink (62 pages)
- DC-POST (101 pages)
- DSV-J2 (30 pages)
- DSV-J2 (68 pages)
- Dimension 3D (49 pages)
- IMS1000 (14 pages)
- IMS1000 (320 pages)
- Fidelio (77 pages)
- LE100 (52 pages)
- Rapid and Rapid-2x (91 pages)
- XDVI-20s (33 pages)
- TMS (106 pages)
- Final Cut Pro (18 pages)
- GENeration3D (40 pages)
- GHX-10 (36 pages)
- HDG-20 (24 pages)
- H2S-30 (40 pages)
- Nugget (58 pages)
- V1UHD-LE (85 pages)
- S2H-30 (39 pages)