Unpacking – Datapath Vision800 User Manual
Page 6
Unpacking
Your packing box should contain the following items:
• The Vision800 Chassis
• Express9 backplane (installed)
• SBC1 (installed)
• Mouse
• Keyboard
• Power cable
• Datapath CD ROM
• SBC documentation
If there are any discrepancies, you should contact Datapath immediately.
Note:
When shipped, the Vision800 contains transit packaging INSIDE the chassis, this must be removed
prior to operation.
To remove the packaging, remove the chassis lid via the two screws located on each side of the case.
6