Unpacking, Cables and adapters - quantity guide – Datapath VSN890 User Manual
Page 5
Unpacking
Your packing box should contain the following items:
• The VSN890 Chassis (Large systems may also include the Vision800X expansion chassis)
• Express9 backplane (installed)
• SBC3 (installed) (VisionVSN890 only)
• Mouse (VisionVSN890 only)
• Keyboard (VSN890 only)
• Cables and Adapters (See Quantity guide Fig. 1)
• VSN890-RPSU / ATX Quick Start Guide
• Image4 Software Installation Suite CD (VSN890 only.)
This CD contains all of the software required for the VSN890,
includingthe drivers for the capture cards and the Wall Control application software.
• SBC documentation (VSN890 only)
If there are any discrepancies, you should contact Datapath immediately.
Note:
When shipped, the VSN890 contains transit packaging INSIDE the chassis, this must be removed
prior to operation.
To remove the packaging, remove the chassis lid via the four screws, two located on each side of the
case lid.
5
Cables and Adapters - Quantity Guide
Fig.1
C1
x 1 - optional. If requested this item may be installed inside the VSN890
C2
x2 per VisionRGB-E2S card. x1 per VisionRGB-E1S and VisionSD4+1 card
C3
x1 per VisionRGB-E1S/E2S card. x1 per VisionSD4+1 card
C4
x1 per VisionRGB-E1S/E2S card. x1 per VisionSD4+1 card
C5
x 1 per SBC2
C6
x2 per Image4 graphics card
C7
x1 per VisionSD8 and x1 per VisionSD4+1 card
C8
x2 for the RPSU model and x1 for the ATX model