TFC Group Towerchron QE2 User Manual
Page 4

INSTALLATION PROCEDURE
Remove QE1/QE2 from packing and prepare it for use on fully pumped or for gravity hot water systems.
d.
For fully pumped systems the switch
located at the rear of the “QE2” must
be moved to the right-
into the “fully pumped” position.
NB • Installation must be carried out by a qualified electrician and conform to current IEE Regulations.
NB • Mains supply must be suitably fused (usually 3 amps) and provision made for Class A circuit disconnection.
Remove QE1/ QE2 from packing and prepare it for use on fully pumped or for gravity hot water systems.
For gravity systems the switch
located at the rear of the QE2
must be moved to the left - into
the gravity position
For “fully pumped systems” the
switch must be positioned to the
right of the slot.
(when viewed from the rear)
Slot
Switch