Installation – Labconco Crude Fiber Digestion Apparatus 30002 User Manual
Page 7
INSTALLATION
8
Installation
Model 30001, 115 Volt, 50/60 Hz. 18.3 amps, is complete except no power cord is
supplied on the unit. The customer must provide wiring to the main power switch in accordance
with local electrical codes. The unit is supplied with 12 - 600 ml beakers. The unit is also
equipped with individual infinite control switches with pilot lights for each heater and a main
ON/OFF switch. The condensers are Type 304 stainless steel. A 3/8" NPT valve is provided to
control water flow through condensers.
Model 30002, 6 unit, 230 Volt, 50/60 Hz, 9.11 amps, is complete except no power cord is
supplied on this unit. The customer must provide wiring to main power switch in accordance
with local electrical codes. The unit is supplied with 12 - 600 ml beakers. The unit is also
equipped with 12 each individual infinite control switches with pilot lights for each heater and a
main ON/OFF switch. The condensers are Type 304 stainless steel. A 3/8" NPT valve is
provided to control water flow through condensers.
Installation Instructions
Location
Choose a location in the laboratory which has a convenient electrical outlet of the voltage
required, a cold water supply of 3/8" NPT and drain facilities of at least 1/2" NPT.
Connections
Connect the 3/8" NPT water inlet valve, located on the upper left side of the unit to your
cold water supply. This valve regulates the flow of water through the condenser heads.
Connect the 3/8" NPT water outlet located on the upper right side of the unit to an open
drain area of at least 1/2" in size. An open drain connection will allow the operator to make a
visual check of water flow through the condenser head system.
After the proper electrical connections are made, the unit is now ready for routine
operation.
Start-Up and Check-Out
All the heater control switches should be turned on to insure proper performance.