4 installation – Glow-worm Hideaway 60CF User Manual
Page 10
10
221809B
Fit plugs into all unused tappings.
Do not route any pipes across the front of the boiler thermostat
pocket, controls or combustion chamber cover.
Pipework must not be routed directly below the draught diverter
across the boiler, but is allowed to be routed under the edges of
the draught diverter.
4.5 Pump in Boiler Casing
If the pump is to be fitted inside the boiler casing, position it as
shown in diagram 4.6 to either of the front connections.
There must be sufficient clearance “X” between the pump body
and the cleaning door to allow for removal of the door for flueway
cleaning.
4.6 Gas Connection
Do not route the gas supply across the combustion chamber or
burner feed pipe. The gas feed must be along the right hand
side of the boiler.
Make the gas connection to the gas service cock.
4.7 Flue Connection
The flue should be 100mm (4in) nominal diameter, refer to
Section 3 and diagram 1.1.
Fix and seal the flue to the hood in accordance with normal
practice.
Diagram 4.6
Diagram 4.5
WATER CONNECTIONS FULLY
PUMPED SYSTEMS
PUMP CLEARANCES
0874
ALTERNATIVE
FLOW
POSITIONS
ALTERNATIVE
RETURN
POSITIONS
With distributor
tube (not shown)
Clearance 'X' must be left to enable cleaning
door removal and boiler servicing
'X'
FLUEWAY
CLEANING
DOOR
ALTERNATIVE
R.H. FLOW
CONNECTION
ISOLATING
VALVES
L.H. FLOW
CONNECTION
175
(7)
35 (1
3
/
8
)
0875
Diagram 4.4
PIPEWORK
CASING CLEARANCES
VIEW ON ARROW 'A'
1524
'A'
57 MAX.
(2
1
/
4
in.)
BOILER
57 MAX.
(2
1
/
4
in.)
4 Installation