the MAP sensor.
At this point remove the lower panel under the dash, and the panel that goes under the
steering column. Drill holes and run LED wiring from the pillar to underneath the dash.
The turn-on LED has a orange/brown wire. Next is locate a solid ground point under the
dash. The black wire from the PAC power distribution box will be attached to this, and
the black wire from the 5 volt MAP regulator(if supplied with system). The red wire with
male spade coming from the PAC will go to a switched ignition source. Typically I will
use one of the free IGN terminals on the fuse box to supply it power, or one of the
heavy duty switched +12 wires coming from the ignition switch assembly. Tip is to
solder off of the thick Orange wire on the ignition switch assembly. And also attach a
black small wire tie to assure the red wire onto factory wiring so it doesn’t come off.
Next is attach the orange wire from the turn-on led to the orange wire coming
from the controller, brown wire to brown wire. Attach the green wire from the
MAP to the green wire on the PAC controller. The violet/gray wire leave alone until
latter.
And finally the pump connections. Cut the wire to length and strip approx 3-4 inches of
insulation from the wire. Remove foil. Then strip about ½ inch of insulation on the red
and black wires that lead to the pump.
On the PAC controller there is a set of wires with pink terminals. Those wires
will be a red, black, and white. Those are the pump drive terminals. Using a
quality set of crimpers, attach male spade terminals to the red, black, and
bare pump cable. Crimp from the bottom opposite the slit in the terminal.
Now connect red wire from pump cable to red wire on PAC with a female
terminal. . Then connect the black wire from pump cable to black wire on
PAC with a female terminal. Then attach bare wire to supplied spade terminal
and install to the White female terminal. Follow the included sheet for tips on
assembling these connections using the supplied heatshrink. That’s it.
PAC terminal wiring instructions
The following pictures show how to connect the pump cable wiring to the
PAC controller.
Tools needed
1)Heavy duty set of crimpers(available through Home Depot, NAPA, Sears,
Klein, Blue-Point, etc.) Do Not Use Cheap made in China crimpers….