beautypg.com

Maintenance, Warning – EarthQuake 5055 User Manual

Page 14

background image

OPERATOR INSTRUCTIONS ANd PARTS

CRT Models 5055 & 6065VE

Page 14

GetEarthquake.com

800-345-6007

SERvICING ThE ROTOTILLER

The following information will help you make the necessary checks
and perform the procedures required to follow the normal care
recommendations made for your rototiller unit.
If you prefer, your local authorized dealer can make these checks and
perform the required procedures for you.

To prevent accidental starting:

Engine must be turned off and cool, and spark
plug wire must be removed and secured from
spark plug before checking and adjusting engine
or equipment.

MAINTENANCE

MAINTENANCE SChEdULE

Your rototiller has been designed and produced by the industry’s leading manufacturer of outdoor power equipment to provide you
with years of reliable operation.
Keeping your tiller in top running condition will prolong its life, and help you obtain optimum performance.
Please read this normal care schedule, and note the recommended care operating intervals to extend the life of your unit.

Maintenance Operation

Page

Before

Each Use

50 hours or

Every Season

change forward/reverse belt

18

x

Engine maintenance

19

x

x

check or fill engine crankcase

19,EM

x

2

check tiller transmission grease

20

x

check tire pressure

20

x

Lubrication

20

x

clean tine axle shaft

20

x

Lubricate wheel axle shaft

21

x

check throttle control adjustment

EM

1

EM = See engine manual
1 Adjust throttle control after first 3 hours of operation or if engine is hard to start or run-on occurs.
change oil after first 5-8 hours of use, then after every 50 hours or every season. change oil every 25

hours when operating under heavy load or in high temperatures.

WARNING

!