Locate beacon signal, Setup, Technique – Ditch Witch UtiliGuard User Manual
Page 42: Utiliguard™ series operator’s manual

UtiliGuard™ Series Operator’s Manual
Locate - 41
Locate Beacon Signal
CMW
®
Locate Beacon Signal
Trace metallic pipes or conduits by locating and following a beacon signal.
Setup
1.
Follow instructions for installing beacon battery.
2.
Turn on receiver to ensure that beacon is functioning properly.
3.
Attach beacon to plumber’s snake or flex rod.
Technique
1.
Turn on receiver.
2.
Set operating mode to Beacon location.
3.
Set antenna configuration to Total Field.
4.
Place beacon into the pipe and move it down
the pipe.
5.
Locate beacon:
Null Point Method: Circle over
approximate location. Follow directional
arrows (1, 3) to locate the null point (2).
The beacon is correctly located at peak
signal between null points.
IMPORTANT: Large metal objects and other signals (such as railroad signals or overhead power lines)
will distort signal.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)