Guidelines, 150r/t operator’s manual – Ditch Witch 150RT User Manual
Page 11

Safety - 10
150R/T Operator’s Manual
Guidelines
CMW
Guidelines
Follow these guidelines before operating any jobsite equipment:
•
Complete proper training and read operator’s manual before using equipment.
•
Classify jobsite based on its hazards and use correct tools and machinery, safety equipment, and work
methods for jobsite.
•
Mark jobsite clearly and keep spectators away.
•
Wear personal protective equipment.
•
Review jobsite hazards, safety and emergency procedures, and individual responsibilities with all
personnel before work begins.
•
Replace missing or damaged safety signs.
•
Use equipment carefully. Stop operation and investigate anything that does not look or feel right.
•
Contact your equipment dealer if you have any question about operation, maintenance, or equipment
use.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 250RT (49 pages)