beautypg.com

Preparation, Tools required for assembly, Hardware provided – Da-Lite IDEA Screen User Manual

Page 2

background image

2

Preparation

Note: It requires two people to assemble an IDEA Screen. To
maintain optimal projected image geometry and screen
alignment, a flat and straight wall free from obstructions and
angular distortions should be used.

Tools Required For Assembly

Phillips Screwdriver

Level

Rubber Mallet

Measuring Tape

Choose a clean work area for assembly using padded material or
other soft, clean materials. The work area should be larger than
the overall screen size and directly in front of the location where
the screen is to be installed.

Hardware Provided

(7) #8 x 1/2” Screws

44” Wall Bracket
(2) 89”, 94¼”, 95¼” and 106” Wide Screens

28” Wall Bracket
(2) 571/2”, 64”, 731/2”, 80”, 81¾” and 84¾” Wide Screens

(2) L-Brackets