Screen and roller assembly installation – Da-Lite Tensioned Large Advantage Electrol User Manual
Page 3
3
If your screen was shipped with the motor and roller already installed proceed to step 7.
1. Remove the access door. First, remove the 2 bolts from each
end with a 9/16" open wrench or socket driver. Next, use a 5/32"
hex key to remove the two screws in the center of the access
door. This will allow the door to drop open on the hinges
(Figure 1).
2. Carefully unpack screen and roller assembly. Use supplied 1/8"
hex key to remove shipping brackets attached to slat. Remove
fabric and roller assembly from shipping board using a 1/2"
wrench. Leave packing paper on roller.
3. Remove the square peg bracket from the motor end of the
roller assembly (Figure 2).
4. Remove the safety clip from the motor attachement bracket
located in the motor end of the screen housing.
5. Use a 1/2" open wrench or socket driver to loosen the four
bolts that secure pin end mounting bracket into housing. Lift
pin end of roller into position and slide the bracket into the
roller pin. Tighten all four bolts. Slide the pin end bracket
towards the end of the case (Figure 3).
6. Place the roller assembly into the case with the motor on the
left side. The limit switches should be facing down. Line up the
head of the motor with the motor attachment bracket.
7. Complete electrical hook-up by snapping motor 1/3 wire
connectors into case connectors (Figure 2).
8. Return to motor end and insert safety clip over casting bracket
to secure motor end.
9. Carefully remove tape strips securing picture surface around
roller. Slat should move freely. (Only if the roller assembly is pre
installed.)
CAUTION!
Do not cut tape on fabric with a knife or any
sharp tool. Remove by hand.
ATTENTION! Ne coupez pas le ruban adhésif sur la toile
avec un couteau ou un outil tranchant. Retirez à la main.
10. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor, the
standard duty cycle is 1 minute on and 3 minutes off.
11. Re-install the access door. Procedure is the reverse of step 1
listed above.
Screen And Roller Assembly Installation
Tools required for screen and roller assembly:
Bolts
Bolts
Figure 3
Figure 1
Figure 2
Bolts
Access
Door
Door Support
Screws
Screen Motor
LVC Control Box
Screen Motor
Limit Switches
9/16“ Open Wrench
or Socket Driver
1/2“ Open Wrench
or Socket Driver
5/32“ Hex Key
1/8“ Hex Key
(included)