beautypg.com

Commissioning check list, General, Unit - ducted evaporative air conditioner – Bonaire Envirotech Deluxe Control (240V) User Manual

Page 8: Ductwork, Ommissioning, Heck, Unit - ducted evaporative air conditioner ductwork

background image

Manual Comfort Control

Control Installation & Setup

PNE2002 Series Control

Page 8

Commissioning Check List

General

!

All equipment ordered by the customer is installed.

!

The unit is level and secure.

!

The mains and control wiring are complete and the circuit breaker and GPO are turned ON.

!

All Controller functions for the appliance operate.

!

All electrical or water connections are to manufacturers specifications and the relevant electrical or

plumbing standards and codes.

Unit - Ducted Evaporative Air Conditioner

!

The water supply line has been flushed to clear swarf and debris and is free of leaks.

!

The tank is free of foreign matter and debris and the water isolating tap is turned ON.

!

Water drainpipe work is completed and sealed.

!

The water basin fills with water and the float valve closes correctly when the water level is 35 -

40mm below the overflow level.

!

The water pump operates correctly when turned ON at the controller.

!

The Dialflo water bleed rate is adjusted to suit local water conditions.

!

The Superclean Dump Valve (option). The tank drains correctly when unit turns off.

!

The fan deck is correctly located and the fan blade spins freely.

!

The fan operates through the entire speed range.

!

The minimum fan speed is correctly set.

!

Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.

!

Areas of high water pressure (Exceeding 500Kpa) a water pressure limiting valve must be fitted in

accordance with AS3500. Consequential damage from high water pressure is not covered by

warranty.

Ductwork

!

All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the

ductwork diameter.