American Standard One T064.60X User Manual
Page 3
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
ADJUST HOT LIMIT STOP
By restricting HANDLE rotation and limiting the amount of hot
water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP 11J reduces risk of accidental scalding. To set the maximum
hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP llj.
Turn CARTRIDGE STEM
(2)
to the OFF position [coldest setting)
before making adjustment to HOT LIMIT STOP (1). Use a flat
blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1J.
Pull forward and rotate counterclockwise one number to limit hot
water temperature. Use ARROW
(3)
on CARTRIDGE
(4)
and NUMBERS
(5)
on HOT LIMIT STOP
(1J
for
indication.
O
(Larger Numbersl
□ 1 3 5 719 11 13 15l
TO GAIIM ACCESS TO VALVE FOR SERVICING
Unthread LEVER HANDLE, loosen SET SCREW and pull
HANDLE off valve stem.
To remove Escutcheon assembly reverse steps in Step 3.
VALVE LEAKS WHEN SHUT OFF
Remove CARTRIDGE
(1)
by removing CARTRIDGE SCREWS
(2).
Remove three SCREWS
(3)
from FIXATION RING
(4)
and pull
out PRESSURE BALANCING
(5)
unit.
Clean SEALS
(S)
on base of CARTRIDGE
(1).
Check base of
PRESSURE BALANCING UNIT
(5)
and clean 0-RINGS
(6).
Remove
CAPS
(7J
and check D-RINGS on inside of CAPS
(7J.
Clean inside
sealing surfaces of VALVE BODY (8).
Reessemble PRESSURE BALANCING UNIT
(5)
and CARTRIDGE
(1J.
Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.
UNABLE TO MAINTAIN CONSTANT TEMPERATURE
Remove PRESSURE BALANCE UNIT
(5).
Remove CAPS
(7)
and
clean valve thoroughly.
Examine balancing unit and check condition of 0-ring on end of
piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS
(7)
and install PRESSURE BALANCE UNIT
(5).
Make sure inlets line up with two holes in bottom of casting.
Top flange should butt-up against top of casting.
BACK TO BACK INSTALLATION
Remove PRESSURE BALANCE UNIT
(5).
Rotate PRESSURE BALANCE UNIT
(5)
1 B0‘ so that the inlets face up and the
large outlet port faces down.
Push PRESSURE BALANCE UNIT
(5)
in casting make sure inlets line up with holes in bottom of casting. Top flange should
butt up against top of casting.
Reassemble FIXATION RING
(4)
and CARTRIDGE
HJ.
ROTATE 180'
INSTALL HANDLE, DIVERTER KNOB, TUB
SPOUT AND SHOWER
■ Thread DIVERTER KNOB (1) onto diverter stem.
■ Hold ADAPTER (2) onto VALVE STEM (3) and install
ADAPTER SCREW
(4)
through ADAPTER (2) into
VALVE STEM (3J.Tighten ADAPTER SCREW
(4)
to
secure ADAPTER (2) to VALVE STEM (3).
■ Install HANDLE BASE
(5)
onto ADAPTER
(2).
Insert
SET SCREW
(S)
into HANDLE BASE
(5).
Align
HANDLE BASE
(4)
and tighten with HEX WRENCH
(7) supplied.
■ Thread LEVER HANDLE
(8)
into HANDLE BASE
(5).
■ Remove pipe cap and plug from shower and tub
rough piping.
■ Install SPOUT ESCUTCHEON
(8)
onto TUB SPOUT
IIO).
■ Apply sealant or Teflon tape to threads of tub filler
nipple. Thread TUB SPOUT (10) onto tub nipple.
■ Install SHOWER ESCUTCHEON (11) onto SHOWER
ARM (12). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (12) and thread longer
leg of SHOWER ARM (12) into shower elbow.
■ Thread SHOWER HEAD (13) onto SHOWER ARM (12).
CAUTION: Protect finish on SHOWER HEAD and
ARM when installing.
SHR.
ELBOW
BACK TO BACK INSTALLATION
M968836