beautypg.com

American Standard Hampton 7225.713 User Manual

Hampton, Amtiea*! sfcmhud, Installation instructions

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

AMtiea*! Sfcmhud

HAMPTOn

THREE HANDLE BATH/SHOWER SET
WITH TRANSFER VALVE

Installation

Instructions

7225.703

7225.713

7225.723

7225.733

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.

To ensure that your installation proceeds smoothly-

please read these instructions carefully before you begin.

Certified to comply with ANSI A112.18.1M

U S. Patent No. 5,819,789

US60407 REV. 1.1

ROUGHING-IN DIMENSIONS

NOTE: NO CONCEALED PIPING FURNISHED

1-1/4 DIA HOLE--------- 1

1/2"N.RT.

SHOWER ARM

OPTIONAL TO FINISHED

FLOOR USUALLY

BETWEEN 65” AND 78”

FINISHED

WALL

1/2" N.RT TO

SHOWER

CROSS
BRACE

(2) 1-13/16" DIA. HOLES
FOR VALVES ON 8"
CENTERS (1] 1-13/16"

DIA. HOLE FOR CENTER

TRANSFER VALVE

1B OPTIONAL

BOTTOM OF TUB

Required Tools

Flat Blade Screwdriver

Phillips Screwdriver

Plumbers' Putty or Caulking

I

Channel Locks

*Hex key Supplied with Fitting

ROUGHING-IN

SHOWER AND SPOUT

CAUTION

IVrn off hot and cold water
supplias bsfors beginning.

"SHR" is pointing upward. Mount VALVE (11 to cross brace with wood screws.

Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe.
Connect HOT (6) water supply to LEFT valve inlet and COLD (71 water supply

IMPORTANT: DO NOT REMOVE PLASTER GUARDS (2J UNTIL STEP 2.

Prepare water supplies per Roughing-in Dimensions. Apply sealing tape

to all threaded connections.

Install VALVE (11 at indicated height and depth. Make sure the outlet marked

------------------- ■ ■■ itVA--------------------------------

Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe.

■ ” ■ '

ply to I "

to RIGHT valve inlet.

Prepare SHOWER RISER (41 and ELBOW (31. Connect to TOP outlet, marked
"SHR" of VALVE BODY (11.

Prepare TUB FILLER PIPE (8], ELBOW (101 and roughing-in NIPPLE (91.
Connect to BOTTOM outlet of VALVE BODY (11.

Add cross braces to wall structure and secure piping.

Cap NIPPLES (9 & 51 and open supply lines and check for leaks. Remove
PLASTER GUARDS (21. Use spline on end of PLASTER GUARD (21 to open
both VALVES and check for leaks. Operate transfer valve and check for leaks.
Close both valves and turn off water supplies. Replace PLASTER GUARDS (21.

Finish wall construction.

'ODD SCREWS

CROSS

BRACE

-COUPLING

NUT

This manual is related to the following products:
Table of contents