beautypg.com

Troubleshooting – Vermont Casting NVC36 User Manual

Page 17

background image

17

NVC Series B-Vent

20000194

Troubleshooting

FP396

Gas Supply On

Supply Line Hooked Up
Shutoff Valve Open

NO

NO

NO

NO

Lockout Has Engaged. Wait
60 Seconds and Try Again.
Piezo Nut Tight for Good Ground.
For Spark at Electrode While
Depressing Piezo (Red Button)
- 1/8" Gap to Pilot Hood Needed.
All Wiring Connections
Replace Piezo Ignitor
Check thermodisk

For Air in the Lines
Thermopile Needs a Minimum
325Mv. Adjust Pilot Flame Height.
All Wiring Connections.
Replace Thermopile
Thermocouple Needs a Minimum
of 14Mv.

Pilot Lights With
Piezo Ignitor

YES

YES

YES

YES

Pilot Stays Lit

Pilot Lights Main
Burner

System Ok.

START

CHECK

Valve is Turned On
Wall Switch is Not Turned On.
Watch for Grounded Wires!
Thermopile Needs a
Minimum 325Mv.
Plugged Burner Orifice.
Defective Valve. Turn to Pilot,
Meter Should Read Greater Than
100 Mv. If Not, Replace.

Nova SIT 820 Standing Pilot

This manual is related to the following products: