Attach clutch cable (see fig. 7), Check tire pressure, Handle height – Poulan 163661 User Manual
Page 7: Assembly
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

ASSEMBLY
REMOVE TILLER FROM CRATE
•
Make sure shift lever indicator is in “N” position {See
Fig. 6)
•
Tilt tilier forward by lifting handle. Separate cardboard
cover from leveling shield.
•
Rotate tiller handle to the right and pull tiller out of
carton.
ATTACH CLUTCH CABLE (See Fig. 7)
• Hook end of clutch cable through hole in control bar
bracket.
CHECK TIRE PRESSURE
The tires on your unit were overinflaied at the factory for
shipping purposes. Correct and equal tire pressure is
important for best tilling performance.
•
Reduce tire pressure to 20 PSI {1.4 kg/cm^).
HANDLE HEIGHT
•
Handle height may be adjusted to better suit operator.
(See “TO ADJUST HANDLE HEIGHT” in the Service
and Adjustments section of this manual).