Initial start up, Start up procedure, Engine generator set only – Winco ULPSS8B4W/E User Manual
Page 13
3
045-00
60706-20
The following is an optional way to interconnect the
Generator and the Transfer Switch. The wires termi-
nate on TB7 as follows:
WIRE #
COLOR
TB7 TERMINAL
# 1
White
# 2
# 24
Red
# 4
# 22
Orange
# 7
The following leads are wire nutted together:
WIRE #
COLOR
FROM
# 5
Black
Generator
# 5
Black
TB7 # 3
# 5
Black
TB7 # 5
# 5
Black
TB7 # 8
� Fuel line protected and a moisture trap in
stalled (may be required for NG).
� LP/NG pressure OK. 4-6 oz. (7- in. WC).
� Battery connections clean and tight.
� Battery fully charged.
� All AC and DC wiring installed and properly
protected.
* Refer to engine owners manual for proper
levels and types.
After completing the above checklist, the engine
generator set is ready for the initial start-up test.
START UP PROCEDURE
Engine Generator Set only
Move the left hand toggle switch from OFF to the
ON position. The alarm light should go out. Next
move the right hand toggle witch from the AUTO to
the RUN position. You should hear the fuel solenoid
engage at this time. Next lift the toggle switch to the
START position and hold. The engine starter should
engage and the engine will start. As soon as the en-
gine starts release the toggle switch and it will return
to the run position. If the engine does not start after
5 seconds release the switch and let the starter rest
for 5 seconds and re-attempt to start. If the unit still
will not start, consult the troubleshooting guide in the
back of this manual.
With the engine running smoothly, check the no load
voltage and frequency at wire # and # 4 (L2 and
L6 in the ASCO ATS) on the generator terminal block
in the ATS. The voltage should be 240 volts plus or
minus nominal. The frequency should be between
6.5 to 62 hertz (Hz). The voltage should also be
checked between the hot terminals (L2 and L6) and
the neutral to be certain of a balanced voltage output
and a solid neutral connection. The voltage should
be about on half of the line to line voltage.
INITIAL START UP
******************
***** WARNING *****
******************
DO NOT jump start these engine generator sets.
Starting these units on a low battery of jump start-
ing them will cause damage to the engine control
module.
Use the following checklist to verify correct in-
stallaion before starting the engine:
� Engine oil.* Check level & fill as required with
proper grade/quantity.
� Unit mounting base properly bolted down.
� Clearance for service and maintenance on all
sides.
� Proper fuel line material and size.
� All fuel line connections tight.