beautypg.com

Initial start up – Winco HPS12000HE User Manual

Page 9

background image

Page 7

60707-115

6190-00

Natural Gas

1

3

4

UNIT OFF

LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

STARTING

LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

NO LOAD

LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

FULL LOAD LINE PSI

7-11 in

7-11 in

4-6 oz

4-6 oz

Remember that whichever fuel delivery system or type of
vapor fuel used, the fuel pressure at the demand regulator
installed on the engine generator must be between 4 and 6
oz. (7-11 inches of water column). Any lower pressure and
the unit will starve for fuel under load. Any higher and the
unit will ‘flood’ when attempting to start.

LP TANK SIZING

Once above the minimum acceptable size, the size of L.P.
tank used will generally depend on how long you want the
unit to run without refilling. The tank sizes shown below are
the smallest recommended tank sizes based on the outside
temperature. Keep in mind the colder it gets the slower L.P.
will vaporize. This is the reason for the larger tanks at low
temperature. Minimum sizing is not based on running time.

Temp

60 deg f.

30 deg f.

0 deg f.

-20 deg f.

HPS6000HE

40 gal

50 gal

125 gal

350 gal

HPS9000E

70 gal

80 gal

200 gal

700 gal

HPS12000HE

150 gal

250 gal

500 gal

1000 gal

CHANGING FUEL TYPES

These engine generator sets are designed to run on three
different fuels; gasoline, natural gas or LP vapor. They may
be easily changed from one fuel to another.

FROM GASOLINE TO LP/NG

1. With the engine running turn off the gasoline

fuel valve.

2. Run the engine until it runs out of fuel.
3. Remove the pipe plug from the demand

regulator.

4. Install locally approved flexible fuel line.
5. Connect the LP/NG vapor fuel line.
6. Turn on the vapor fuel.
7. Start the engine.
8. Apply the load to the generator.
9. On the HPS6000 and the HPS9000 adjust the fuel

mixture valve to smooth the engine out. The
HPS12000 has two different hose fittings. One is for
LP and one is for Natural Gas. Make sure the hose is
attached to the proper fitting.

Note: Operating on LP/NG vapor fuel for an extended
period of time without liquid fuel in the carburetor may
damage the carburetor float, and the needle seat assembly.
If you plan to convert back to gasoline, we recommend the
float and needle seat assembly be removed from the
carburetor. (Consult a local engine supplier for assistance.)

FROM LP/NG TO GASOLINE

1. With the engine running turn off the LP/NG fuel

supply.

2. Run the engine until it runs out of fuel.
3. Remove the flexible fuel line from the demand

regulator.

4. Reinstall the plastic plug in the regulator.
5. Check to be sure the gasoline fuel valve is off.
6. Fill the gasoline fuel tank.
7. Turn on the gasoline fuel valve.
8. Start the engine.

Optional Dolly Kit

(HPS9000 & HPS6000)

An optional dolly kit is available for these engine generator
sets. The dolly kit comes with instructions and parts list.
After installing the dolly kit, file the instructions and parts list
in the back of this manual for future reference. The
HPS12000HE is shipped standard with a dolly kit.

INITIAL START UP

Use the following checklist to verify the correct preparation
of the engine generator before starting.

Before Starting always Check:

1. Engine oil, fill as required with correct grade and

quantity. Use the dipstick.

2. Fuel level, fill as required with clean fresh fuel.
3. If you are using LP or NG besure the fuel is turned

on and all connection are tight.

3. Visually for loose parts.

STARTING

The throttle control on these generators is preset and locked
to operate at 3600 RPM (nominal) with no load speed set at
3750 RPM. Only a trained service technician should be
allowed to adjust this speed setting. See “Operating Speed”
section for additional information.

NOTICE: ENGINE START LOCKOUT

This unit will not start if it is low on oil. The lubricating oil
level must be at the full mark before the engine will start.

MANUAL STARTING - Refer to the engine manual for
additional starting, operating, and stopping instructions.

NOTICE: TRI-FUEL STARTING

Tri-Fuel generators operating on vapor fuel, (either LP or
NG) must be started using the electric start system
provided. You cannot hand crank the unit fast enough to
develop the proper vacuum to make the vapor fuel system
work. In addition the demand regulator on the HP6000HE
has a primer button in the center, which must be
depressed while engaging the starter. WHEN USING
VAPOR FUEL NEVER USE THE CHOKE.
Use of the
choke will prevent the air and fuel from properly mixing.

This manual is related to the following products: