beautypg.com

Cmtro - 75, Ro system diagram, Back view of bracket – Water Factory Systems CMTRO-75 User Manual

Page 3: Flow control assembly (back view of ro cartridge)

background image

CMTRO - 75

RO System Diagram

Before beginning the installation, spend a few minutes studying the drawing below.

To Cooler Tank

(3/8” Blue

Polyethylene Tubing)

Product Water

Outlet Fitting

Filter Icon

Bayonet Filter

Cartridge

1/4" Orange
Polyethylene Tubing

Ty-Rap (Used to fasten
tubing to cooler)

Filter Icon

Feedwater Inlet

1/4” Green Polyethylene
Tubing with Flow Control
Assembly

To StorageTank
(3/8 Yellow Polyethylene Tubing)

Back View of Bracket

Drain Line
(Green Tubing)

Flow Control Assembly

(Back View of RO Cartridge)

1

2

Flow Control

RO Drain Line Construction:
1) Insert the thin flow control tubing with
attached bushing and stop into the 1/4 green tubing.
2) Insert the green tubing with bushing end into
the elbow located at the bottom of the RO module.

2