Cmtro - 75, Ro system diagram, Back view of bracket – Water Factory Systems CMTRO-75 User Manual
Page 3: Flow control assembly (back view of ro cartridge)
CMTRO - 75
™
RO System Diagram
Before beginning the installation, spend a few minutes studying the drawing below.
To Cooler Tank
(3/8” Blue
Polyethylene Tubing)
Product Water
Outlet Fitting
Filter Icon
Bayonet Filter
Cartridge
1/4" Orange
Polyethylene Tubing
Ty-Rap (Used to fasten
tubing to cooler)
Filter Icon
Feedwater Inlet
1/4” Green Polyethylene
Tubing with Flow Control
Assembly
To StorageTank
(3/8 Yellow Polyethylene Tubing)
Back View of Bracket
Drain Line
(Green Tubing)
Flow Control Assembly
(Back View of RO Cartridge)
1
2
Flow Control
RO Drain Line Construction:
1) Insert the thin flow control tubing with
attached bushing and stop into the 1/4 green tubing.
2) Insert the green tubing with bushing end into
the elbow located at the bottom of the RO module.
2