beautypg.com

Sealing the lnb connection – TechniSat SATMAN 45 Manual User Manual

Page 7

background image

7

Multytenne

EN

FR

IT

NL

CZ

PL

Sealing the LNB connection

Dear customer,

in order to prevent any moisture from entering the Multytenne LNB, please use the self-sealing duct tape

supplied to insulate and seal the LNB connection.

1.

First remove the foil from the sealing tape.

2.

Apply one end of the sealing tape approx. 1-2 cm below the F-connector.

3.

Now stretch the sealing tape as much as possible, and wrap it around the co-axial cable and the

F-connector, with overlapping edges. Stretching the sealing tape ensures that the layers of tape

form a sealed bond at the overlapping edges.

4.

The LNB is now insulated and sealed, so that no water or humidity can penetrate.

This manual is related to the following products: