Step 1 - option b plaster board with stud – Seville Classics WEB198 User Manual
Page 5
![background image](/manuals/710807/5/background.png)
or
#01
#10
Decide where to hang the rail.
Start from one side of the
desired location to find the first
stud.Locate the second stud 16”
from either side of the first stud.
Note that the distance between
two studs is normally 16” (center
to center). Mark the rest of the
screw holes, use screws (#10) to
fasten the rail. For all screws that
are not located directly over a
stud, drill a 5.5mm hole and
hammer the plastic anchor (#11)
into the hole. Insert a screw
(#10) into the plastic anchor and
then securely fasten the rail.
Please note when you start to
fasten the railplease flush the
rail end with the first stud center.
UltraHD Storage Hook Set(Model No. 20259)
pg 4 of 7
16”
16”
16”
16”
16”
16”
Step 1 - Option B
Plaster Board with Stud
Note: when you start to fasten the railplease flush the rail end with the first stud center
stud