2 position sensor installation – NORAC 5467BC-JD User Manual
Page 5
2
2 Position Sensor Installation
1. Remove the existing roll sensor, roll sensor bracket and target rods from the sprayer.
When removing the roll sensor, leave the 2-way coupler and cabling in place as this will be
used to connect the position sensor to the system.
Figure 1: Components to Remove
2. The position sensor (E06) should be mounted such that the largest amount of travel of the
sensor can be utilized without exceeding the travel limit. The sensor install length is 17”
(430mm) center to center with ±3.5” (±90mm) travel recommended. It should be mounted
in a location where the sensor will mount without binding or contacting and that is
perpendicular to the direction of travel. Roll the boom fully in each direction and take
measurements to ensure the travel limit is not exceeded.
3. Measure 12-3/4” (325mm) from the centerline of the intermediate frame and boom center
frame towards the left side of the sprayer (when looking from the rear of the sprayer).
Figure 2: Measurement from Centerline of Intermediate Frame (Looking from the Rear)
12-3/4”
(325mm)
Remove Bracket and
Sensor (leave cabling
connected)
Remove
Spring Target
Remove
Frame Target