beautypg.com

3 switch box installation – NORAC 54VT-GS2-PT01 User Manual

Page 8

background image



6

3.3 Switch Box Installation

1. This step of the installation assumes that the input module and all required cables are

installed.

2. Disconnect cable C20 (Thru 2 connector) from the Input Module (E03). Remove the wedge

from the face of the 12 pin Deutsch plug. The wedge is removed by inserting a small flat
implement underneath the wedge and lifting it up.

3. Insert the Roll CW pin from C26 into position 3 of the 12 pin plug on C20. Insert the Roll

CCW pin from C26 into position 4 of the 12 pin plug on C20. Insert the wedge back into
the plug. Connect C20 to the Thru 2 connector on the Input Module.

4. Connect the 12 pin Deutsch plug on C26 to the OEM 3 connector on the input module.

Route the other end of the cable to the hitch of the sprayer.

5. If cable C26 is not long enough, an extension cable is available for order from NORAC.

Item

Part Number

Name

C27

44658-98

CABLE UC4 3M EXTENSION 16-PIN AMP

6. Attach the switch box (C25) inside the cab and connect it to cable C26. An extra label is

provided with the switch box if you prefer to remove the switches from the housing and
mount them in the existing sprayer switch panel.

* Some sprayer types may not use all the switch functions.

Figure 3: Switch Box Installation