beautypg.com

2 valve block mounting – NORAC UC5-BC-MC02 User Manual

Page 26

background image



23

10.2 Valve Block Mounting

1. Mount the valve block to the boom.

2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes

are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.

3. Use the remaining hardware to secure the block to the sprayer.

4. Cut off excess threaded rod, if necessary.

Figure 24: Valve Block Mounting