beautypg.com

NORAC UC4+BC+WR1 User Manual

Page 24

background image

21

Figure 25: Cable Configurations: C01,

C02, C02B, and C03

7. Route C04 and C01 to the rear of the

sprayer where the NORAC hydraulic
valves are located.

8. Connect the 6-pin Tower on the UC4+

Valve Cable (C03) to the 6-pin Shroud
on C04 at the rear of the sprayer
(Figure 25).

9. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 26: Valve Cable Connections

10. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C11 (Figure
25
).

11. Route the CAN Node cable (C02B) to

the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.

12. Connect 4-pin AMP connectors on

C02B to the sensors.

13. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B

(Figure 25).

14. Route the sensor branch cable (C02) to

the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.

15. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.