NORAC UC4+BC+WR1 User Manual
Page 24
21
Figure 25: Cable Configurations: C01,
C02, C02B, and C03
7. Route C04 and C01 to the rear of the
sprayer where the NORAC hydraulic
valves are located.
8. Connect the 6-pin Tower on the UC4+
Valve Cable (C03) to the 6-pin Shroud
on C04 at the rear of the sprayer
(Figure 25).
9. The connectors on the valve cable
(C03) are marked RIGHT UP, LEFT
UP, RIGHT DOWN and LEFT
DOWN. Cables labeled with UP go
on the same side as the hydraulic hoses.
Figure 26: Valve Cable Connections
10. Connect the CAN Node cable (C02B)
to the 4-pin AMP plug on C11 (Figure
25).
11. Route the CAN Node cable (C02B) to
the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.
12. Connect 4-pin AMP connectors on
C02B to the sensors.
13. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B
(Figure 25).
14. Route the sensor branch cable (C02) to
the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.
15. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.