beautypg.com

8 completing the installation – NORAC UC4+BC+SC1 User Manual

Page 27

background image

24

4.8 C

OMPLETING THE

I

NSTALLATION

1. Start up your sprayer and test the sprayer’s

functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.

Confirm that the cabling/hoses are

agreeable to the entire range of
motion.

2. If any functions do not work, review the

hydraulic and electrical portions of this
manual to check for proper installation. If
you still have trouble, contact NORAC for
assistance.

3. Turn on the power for the UC4+ Control

Panel using the switch on the side of its
chassis.

4. Repeat the Boom Speed Test as described in

Section 4.2 Boom Speed Test with the
NORAC UC4+ Spray Height Control
system installed. Record the results for
comparison in Table 5.

5. The procedure for the installation of the

UC4+ Spray Height Control system is now
complete. Begin the AUTOMATIC SYSTEM
SETUP procedure as described in the UC4+
Spray Height Control Operator’s
Manual
(M01).