7 electrical installation – NORAC UC4.5-BC-PS1 User Manual
Page 24
21
7 Electrical Installation
Not all cables required are included in this kit. Consider building your own
cables or refer to the NORAC Generic Cable Ordering Guide to order the
necessary cables.
While installing the electrical parts, refer to Section 11 for identification of
cables and connectors.
1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it
will be clearly visible and within easy reach of the operator.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the
Roll Over Protection Bar (ROP). Four pilot holes for the screws provided need to be
drilled to facilitate the control panel mounting.
Another option is to purchase an adapter for the flexible panel mount that has a 3/8" NC
threaded stud on the end to bolt through an existing mount. These can be found at your
local outdoor store as a RAM mount part number RAM-B-236. (See
http://www.ram-
mount.com/
)
Figure 23: UC4.5 Power and Valve Extension Cables
2. Connect the UC4.5 power cable (C10) to the UC4.5 control panel in the sprayer cab.
Ensure both plugs (P16 and P4) are connected to the panel. Cable tie C10 to the RAM
mount to help provide strain relief.
Ensure the UC4.5 control panel’s power is OFF for the remaining installation
(Bottom of switch pressed IN).
3. Connect the power cable connector (P6A) to an auxiliary power connection in the sprayer.
4. Route the P12 and P6B of C10 out of the cab.