NORAC UC4.5-BC-MC2 User Manual
Page 19
16
Figure 16: Cable Configurations: C03, C11 and C12
6. Run cable C11 to the rear of the sprayer, in the vicinity of the valve block.
7. Connect the 6-pin shroud (S6) on C12 to T6 on C11.
8. Route the free end of C12 to the Miller valve block and insert the 2-pin tees between the
matching valve connections. For each tee, the function (e.g. “Main Up”) is labeled on the
branch wire.
9. Unplug the connectors on the existing valves. There are 4 connectors to unplug (as labeled
on the valve bank): LEFT UP, LEFT DOWN, RIGHT UP and RIGHT DOWN. Plug in the 2-
pin tower of C12 to the matching existing valve connections. For each connector, the
function (e.g. “LEFT UP”, etc.) is labeled on the branch wire.
10. Connect the valve interface cable (C03) to connector S6 on the valve extension cable
(C11).
11. Connect the 2-pin connectors on the valve interface cable to the NORAC valve block, as
shown in Figure 17.
12. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT DOWN
and LEFT DOWN. Cables labeled with UP go on the same side as the hydraulic hoses.
Figure 17: Valve Cable Connections