1 general installation instructions using 44658-51 – NORAC UC4.5-BC-HD4 Part 1 User Manual
Page 25
22
7.1 General Installation Instructions using 44658-51
Figure 20: Cable Overview (Using 44658-51)
1. Connect the UC4.5 power cable (C10) to the UC4.5 Control Panel in the cab. Ensure that
both plugs (P16 and P4) are connected to the panel. Cable tie C10 to the RAM mount to
help provide strain relief.
2. Route the P12/P6 of C10 to the exterior of the cab.
3. Connect P12/P6 to R12/R6 of the extension cable (C11). Connect at the hitch. This
connection will provide the hitch disconnect.
4. Run cable C11 from the hitch to the rear of the sprayer.
5. Route the 6-pin and 4-pin tower connectors (T6 and T4) of C11 in the vicinity of the Job-
com box.
Ensure power to the Job-com is turned off.
6. If the sprayer uses one forward/reverse valve and a number of cartridge valves (HARDI
DH) turn ON the DIP switch of C12A (Figure 21). Otherwise leave the switches OFF
(HARDI DAH). There is denotation on the switch. Turn BOTH switches either ON or
OFF.