beautypg.com

7 electrical installation – NORAC UC4.5-BC-FT1 User Manual

Page 17

background image



14

7 Electrical Installation

Figure 14: Cable Configurations: C03, C11, C12 and C13

1. Route C11 to the vicinity of the valve block at the rear of the sprayer. Note that the

R12/R6 connectors provide the hitch connection.

2. Connect the 6-pin shroud (S6) on C12 to the 6-pin tower (T6) on C11.

NOTE: If the sprayer is equipped with a Fasse 6 station valve block, the wires in

positions A and B of T6 on cable C11 must be swapped. Use the included
pin removal tool (M10).

3. Connect the 3-pin shroud (S3) on C13 to the 3-pin tower (T3) on C11.

4. Route the free ends of C12 and C13 to the existing valve block. Insert all of the Deutsch

tees between the matching valve connections. The function is labeled on the branch wire
for each tee.

It is recommended to connect P2C and R2C (Bypass) on C13 to the existing

valve block even though it is not used.

5. Connect the 6-pin tower on C03 to the 6-pin shroud on C11. Connect the 2-pin

connectors on C03 to the NORAC valve block, as shown in Figure 15.

6. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT

DOWN and LEFT DOWN. Cables labeled with UP go on the same side as the
hydraulic hoses.