Installation, Instrument introduction – LABEC V-11D User Manual
Page 7

- 4 -
Installation:
1) After carefully unpacking the contents, check the materials with the packing list (page
3) to ensure that you have received everything in good condition.
2) Place the instrument in a suitable location away from direct sunlight.
3) In order to have the best performance from your instrument, keep it as far as possible
from any strong magnetic or electrical fields or any electrical device that may
generate high-frequency fields.
4) Set the unit up in an area that is free of dust, corrosive gases and strong vibrations.
5) Remove any obstructions or materials that could hinder the flow of air under and
around the instrument.
6) Use the appropriate power cord and plug into a grounded outlet.
7) Turn on the instrument of
SPECTRO-
V11D, it begins to self test. After that and 20
min. ̀
pre-warm, you can take any readings.
NOTE:
This symbol means Caution, Risk of Danger.
Instrument Introduction
1. Appearance
Please See Figure 3-1:
Main View