Out of production – LAARS Newport - Installation, Operation and Maintenance Instructions User Manual
Page 5

Newport Oil-Fired Heater
Page 5
TANKLESS DO-
MES TIC
HOT WATER COIL
½" NPT
TRIDICATOR
FLAME VIEWING
PORT
Figure 2. Components Location.
PRESSURE RELIEF VALVE
FLUE CONNECTION
AIR VENT
HYDRONIC
SUPPLY PIPE
AQUASTAT RELAY
L8124A OR L7224A
¾" NPT
WIRING CONDUIT
CIRCULATOR 1¼" NPT
BURNER
Tapping
NPT
Tankless Coil
½"
Tridicator
¼"
Hydronic Return
1¼"
Hydronic Supply
1¼"
Aquastat Well
¾"
Relief Valve Fitting
¾"
WARNING
Flue gases are dangerous - do not operate
boiler if there is an escape of flue gas. Call a
qualified serviceman and have the entire flue
and venting system inspected.
1.17 Cleaning the Boiler
To maintain the high thermal efficiency and
a long life from your boiler, it should be cleaned at
least once a year, preferably at the end of the heating
season. This is particularly important as rusting can
occur when the boiler is idle.
It is recommended that a service contract be
ar ranged with a properly equipped serviceman who
will be able to do the job efficiently and without mess.
1. Switch off electrical supply to the boiler.
2. Remove smoke-pipe from boiler.
3. Remove top jacket panel.
4. Unscrew the securing nuts and remove flue
col lec tor.
5. Remove baffles from flue tubes.
6. Remove burner by unscrewing the flange
mounting nuts.
OUT OF
PRODUCTION
- LCH504T - Installation Manual (30 pages)
- Combi Heat TTW - Installation Manual (45 pages)
- Custom ASME Storage Tanks - Installation Manual (1 page)
- EBP 110 MBTU/h - Installation, Operation and Maintenance Instructions (40 pages)
- IGE-199R - Installation Manual (44 pages)
- IGE-199R-10(N,X) - Service Manual (60 pages)
- IGI-180R - Installation Manual (68 pages)
- IGI-180R-10(N,X) - Service Manual (64 pages)
- EverHot (interior) Venting Components - Installation Manual (16 pages)
- Heat Exchanger - Installation Manual (1 page)
- Gateway RER - Manual (33 pages)
- INDIRECT-FIRED - Installation, Operation and Maintenance Instructions (36 pages)
- M4-LHS - Installation Manual (55 pages)
- MagnaTherm MGH - Installation, Operation and Maintenance Instructions (104 pages)
- Mascot LX MLXH 50 MBH - Install and Operating Manual (56 pages)
- MC4EXT - Install and Operating Manual (4 pages)
- Mighty Stack MS-080 (Sizes 199, 300, 399) - Install and Operating Manual (36 pages)
- Mighty Therm HH-PH (Sizes 175-400) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW-PW (Sizes 175-400) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm AP (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (20 pages)
- Mighty Therm HH (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm VW (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm AP (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm HH (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm2 MT2H (Sizes 500–2000 MBTU/h) - Install and Operating Manual (40 pages)
- Mighty Therm2 MT2H (Sizes 200, 300, 400) - Install and Operating Manual (42 pages)
- Mighty Venter MV1 (Sizes 175-400) - Install and Operating Manual (12 pages)
- Mighty Venter MV2 (Sizes 500-1825) - Install and Operating Manual (12 pages)
- Mighty Therm2 MT2P (Sizes 500–2000 MBTU/h) - Install and Operating Manual (32 pages)
- Mini-Therm JVH (Sizes 50-225) - Install and Operating Manual (40 pages)
- Multi Flue CF-38-3 - Install and Operating Manual (16 pages)
- NeoTherm LC NTH1000 - Install and Operating Manual (140 pages)
- NeoTherm LC NTH (Sizes 1000-1700 MBTU/h) - Installation Manual (6 pages)
- NeoTherm NTH (Sizes 285–850 MBTU/h) - Installation Manual (4 pages)
- NeoTherm NTH (Sizes 080–285 MBTU/h) - Service Manual (110 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Start Up Guide (16 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Install and Operating Manual (92 pages)
- NeoTherm NTH (Sizes 399-850 MBTU/h) - Service Manual (118 pages)
- Pennant PNCP - Install and Operating Manual (40 pages)
- Pennant PNCH (Sizes 500-2000) - Install and Operating Manual (64 pages)
- Pennant PNCH - Install and Operating Manual (44 pages)
- Rheos RHCH - Install and Operating Manual (60 pages)
- Rheos Side-Wall Ducted Combustion Air Terminal - Service Manual (1 page)
- Rheos Side-Wall Vent Termination - Service Manual (1 page)