Installation, Continued, Connecting to gas supply – Desa Tech CSPINT User Manual
Page 9
www.desatech.com
111487-01E
9
INSTALLATION
Continued
Figure 5 - Minimum Clearance to Walls
and Ceiling (Stove May Vary Depending
on Model)
Front View
Top View
Side View
12"
Minimum
12"
Minimum
48"
Minimum
Ceiling
Side Wall
Side Wall
Back Wall
Side Wall
Side Wall
12 "
Minimum
12 "
Minimum
6 "
Minimum
6"
Minimum
48"
Minimum
Ceiling
Floor
Back Wall
Corner
Wall
Wall
6 "
Minimum
6 "
Minimum
Front of Stove Unit
Front of Stove
Unit
Front of
Stove Unit
CONNECTING TO GAS SUPPLY
WARNING: This appliance
requires a 1/2" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualified service
person must connect heater to gas
supply. Follow all local codes.
CAUTION: Never connect
propane/LP heater directly to the
propane/LP supply. This heater
requires an external regulator
(not supplied). Install the exter-
nal regulator between the heater
and propane/LP supply.
WARNING: Never connect
natural gas heater to private (non-
utility) gas wells. This gas is com-
monly known as wellhead gas.
Installation Items Needed
Before installing heater, make sure you have the
items listed below.
• external regulator [propane/LP only] (supplied
by installer)
• piping to stove location (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• test gauge connection *
• sediment trap
• tee joint
• pipe wrench
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certified equipment shutoff valve from your
dealer. See Accessories, page 19.
The gas inlet connection for the stove heater is
located on the lower right-hand side of the stove
when viewed from the front of the unit. The gas
connection can be made either through the bottom
right side or through the lower back opening as
illustrated in Figure 6, page 10. Make sure gas log
heater is secured to the stove cavity assembly.