Net installation – Jaypro Sports ITS-300 User Manual
Page 2

Net Installation:
1. Stretch out the net across the court.
2. Since this Post is internally wound, cut off the loop at one end of the cable for the take up
side. Insert the plain end over the pulley and down into the post, threading it through the barrel
of the winch.
3. Attach the loop on the other end of the cable to the hook on the outside of the static post.
4. Turning the handle clockwise, crank up cable so center of the net is approximately 38".
DO NOT OVER TIGHTEN .
5. Square up the Net and tie off the head band around each post.
6. Lace rest of the Net to the post using the black lacing cord through the grommets on the end
bands and the lacing rods on the side of the posts.
7. If using a center strap, adjust the height at center to 36".
8. Your installation is now complete and your net is ready for play.
POST ADJUSTING
COLLAR
INTERNAL
GEAR WINCH
CABLE
CUT OFF LOOP
THIS END ONLY
HEAD BAND
36"
CENTER STRAP
(not included)
38"
rev. 10/04
J HOOK
Page 2
- GNJA1 Installation (7 pages)
- BLPS-84 (5 pages)
- BBLD-5000 (18 pages)
- BLFS-101 (5 pages)
- BSP-30 (5 pages)
- BSP-40 (5 pages)
- BSP-40-66 (9 pages)
- BSP-30-6 (9 pages)
- BSP-33-2 (10 pages)
- BSP-44-22 (10 pages)
- BBTF-55 (8 pages)
- PROTF-55 (7 pages)
- BBTFSM-55 (10 pages)
- BBC-SPDKT (13 pages)
- BBC-700M (24 pages)
- BBC-WLKT (10 pages)
- BBC-SPRTKT (8 pages)
- CVS-10 (2 pages)
- BGLC-7500RD (24 pages)
- BBLS-12 (14 pages)
- BBGS-18RB (15 pages)
- BBFP-20 (5 pages)
- BBFP-30 (13 pages)
- FS-101 (4 pages)
- FS-77 (4 pages)
- PS-84 (5 pages)
- BLFSW (5 pages)
- BLFS-88 (5 pages)
- PSTS-77 (5 pages)
- LC-1 (3 pages)
- LC-6 (16 pages)
- PBEL54 (31 pages)
- MBBP-6 (2 pages)
- GBDD-AHA (9 pages)
- GAK-5 (4 pages)
- GBA-542 (10 pages)
- TSP-200 (15 pages)
- TSP-44 (15 pages)
- 996 (4 pages)
- 656 (4 pages)
- PBB-200 (13 pages)
- PBEL-SCB (6 pages)
- Stationary Backstops (16 pages)
- WM-48 (5 pages)
- WMSS (13 pages)