Assembly instructions, Jaypro sports – Jaypro Sports SGP-440EB User Manual
Page 4

Rev: I
7/11/11
Page 4 of 8
JAYPRO SPORTS
Official Permanent, Semi-Permanent Round Soccer Goal, SGP-440 / SGP-440EB
** READ ALL DIRECTIONS CAREFULLY BEFORE BEGINNING THE ASSEMBLY **
ASSEMBLY INSTRUCTIONS
TOOLS REQUIRED:
(1) Socket Wrench and Box Wrench
(1) 7/32” Allen Wrench
(1) Rubber Mallet
(1) Flat Blade Screw Driver
(1) Phillip Head Screw Driver
(1) Step Ladder
(1) Pliers
Soccer Goal Installation:
1) Determine the proper location for the goal uprights (item 2 & 3) on the soccer field.
The spacing between uprights is 24’-4” center-to-center. Dig the footing holes to the
dimensions as shown on the illustration. These are minimum suggested dimensions
for average soil conditions.
2)
For best results assemble the main goal frame, uprights (item 2 & 3) and crossbar
(item 1) on the ground prior to placing in the footing.
NOTE: SLIDE NUT BAR
INTO THE CHANNEL OF EACH UPRIGHT FOR EUROPEAN BACKSTAY
ADAPTER.
Permanent Installation:
3) Lower the assembled goal face into the footing. Block beneath and around each
upright, plumb the structure and pour the concrete. Check that the distance between
the playing surface and the crossbar of the upright is 8’. Brace the structure to assure
that it does not shift during the footing curing process.
4)
Wait for the concrete to fully cure according to the manufacturer’s instructions.
Semi-Permanent Installation: SGP-445G Ground Sleeve Sold Separately
(Note: whenever goal is removed from ground sleeves for maintenance or storage, always
cover the open end of the sleeve using the top cap (SGP-445GC) provided.)
3)
Slip the ground sleeves (SGP-445GS) onto the bottom of each upright and lower the
assembled goal face into the footing. Block beneath and around the sleeves, plumb the
structure and pour the footing. Be careful to ensure that concrete does not enter the inside
of the sleeve. Check that the ground sleeve does not stick above the playing surface and
that there is 8’ from the playing surface to the underside of the crossbar. Brace the
structure to assure that it doesn’t shift during the curing process.
4)
Wait for the concrete to fully cure according to the manufacturer’s instructions.
5)
Install Rear Backstays (item 4 /5) into the hub of each corner piece of the upright
(item 2 & 3) as shown in the illustration (Detail A1/A2).
6)
Anchor base of each Rear Backstay (item 4) using ground stake (item 15). (Detail B)
7)
Locate the upper corner of the net. Draping the net over the rear backstays (item 4 /5)
attach the net to the back of the goal face using the net clips provided.