Foul Pole Assembly:

1. Install the yellow powder coated cap on top of foul pole with #12-14 self-

drilling screw.

2. Install one anti-rotation rod into the bottom side of the lower foul pole. By

inserting it into the pre-drilled hole with 1/2" flange nuts back to back as
shown in the illustration below.

3. Pour concrete into the footing and reinforce with six 3/4” x 36” long rebar

(consult local building code. Rebar not included, to be provided by
installer)
evenly space around the spot for the lower foul pole.

4. Using a lifting device (crane) place the foul pole into the footing and fully

support it in a plumbed position.

5. Slop the top of the footing for drainage if desired. Wait for concrete to

fully cure (approx. 48 hours).