Jaypro Sports BSP-30 User Manual
Page 4

Page 4 of 5
Upright Panel Assembly
1. Install all brace bands and band
tensions by sliding them from the
top of the upright (see the
illustration to the right). DO NOT
STRETCH THE BANDS.
2. The orientation of the tension
band must be consistent. As one
side of the tension band is off set
for attaching the galvanized chain
link fence flush to the pipe.
3. Insert the 113-1/2” long pipe into
the rail ends. Attach this to the
brace bands with 5/16” carriage
bolt, washer & nut hardware.
4. Weave the 3/16” thick bar tension
into the chain link panel and
attach this to the band tension
with 5/16” hardware.
5. Repeat previous step till all the
panels is enclose with chain link.
Step 1 & 2 & 3
S
tep 4
See also other documents in the category Jaypro Sports Sports and recreation:
- GNJA1 Installation (7 pages)
- BLPS-84 (5 pages)
- BBLD-5000 (18 pages)
- BLFS-101 (5 pages)
- BSP-40 (5 pages)
- BSP-40-66 (9 pages)
- BSP-30-6 (9 pages)
- BSP-33-2 (10 pages)
- BSP-44-22 (10 pages)
- BBTF-55 (8 pages)
- PROTF-55 (7 pages)
- BBTFSM-55 (10 pages)
- BBC-SPDKT (13 pages)
- BBC-700M (24 pages)
- BBC-WLKT (10 pages)
- BBC-SPRTKT (8 pages)
- CVS-10 (2 pages)
- BGLC-7500RD (24 pages)
- BBLS-12 (14 pages)
- BBGS-18RB (15 pages)
- BBFP-20 (5 pages)
- BBFP-30 (13 pages)
- FS-101 (4 pages)
- FS-77 (4 pages)
- PS-84 (5 pages)
- BLFSW (5 pages)
- BLFS-88 (5 pages)
- PSTS-77 (5 pages)
- LC-1 (3 pages)
- LC-6 (16 pages)
- PBEL54 (31 pages)
- MBBP-6 (2 pages)
- GBDD-AHA (9 pages)
- GAK-5 (4 pages)
- GBA-542 (10 pages)
- TSP-200 (15 pages)
- TSP-44 (15 pages)
- 996 (4 pages)
- 656 (4 pages)
- PBB-200 (13 pages)
- PBEL-SCB (6 pages)
- Stationary Backstops (16 pages)
- WM-48 (5 pages)
- WMSS (13 pages)