Operating instructions – ebm-papst R3G280-AU06-B1 User Manual

Page 12

background image

Operating instructions

R3G280-AU06-B1

Translation of the original operating instructions

Check the
insulation of
the wires for
damage

Visual inspection At least every

6 months

Replace wires

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean or
replace impeller

Tightness of
screwed cable
gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensate
discharge
holes for
clogging, as
necessary

Visual inspection At least every

6 months

Open bore holes