Installation instructions – Cannon C60DT User Manual
Page 34

TECHNICAL DATA
Gas connection
Rp
1
/
2
(
1
/
2
” BSP female)
Pressure test point
Front left hotplate injector
Gas rate adjustment
None
Aeration adjustment
None
Electrical connection
4mm
2
twin and earth
230/240V a.c. 50Hz.
HEAT
INPUT
G20 at 20mbar
G30 at 28-30mbar
G31 at 37mbar
BURNER
INJECTOR
3.0 kW
HOTPLATE
Front left and rear right
116
2.0 kW
HOTPLATE
Front right and rear left
103
HEAT
INPUT
INJECTOR
3.0 kW (220g/h)
86
2.0 kW (145g/h)
70
INSTALLATION INSTRUCTIONS
34
Traditional 60
C60DT
HEAT
INPUT
G20 at 20mbar
G30 at 28-30mbar
G31 at 37mbar
BURNER
INJECTOR
3.0 kW
HOTPLATE
Rear right
116
2.0 kW
HOTPLATE
Front right and Rear left
Total load
103
HEAT
INPUT
INJECTOR
3.0 kW (220g/h)
86
4.1 kW
HOTPLATE
Front left
100 + 72 + 100
3.8 kW (275g/h) 63 + 42 + 63
2.0 kW (145g/h)
70
Professional 60
C60DP
4.5 / 4.9 kW
Total load
4.5 / 4.9 kW