Overview, Prepare site eor instaeeation, Overview and site preparation – Kenmore 625.38156 User Manual
Page 7
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Overview and Site Preparation
OVERVIEW
There are seven easy steps to installing your Drinking
Water system. They are as follows:
STEP 1
- Install Cold Water Supply fitting
STEP
2 -
Install Drain Adapter
STEP
3 - Install Reverse Osmosis Assembly
STEP 4
- Install Storage Tank
STEP 5
- Install Reverse Osmosis Faucet
STEP 6
- Connect Tubing
STEP
7 - Sanitize, Pressure Test, Purge System
These steps are explained in detail over the next few
pages.
It is recommended to read through the entire manual
before beginning your installation. Follow all steps exact
ly. Reading this manual will also help you receive and
use all the benefits your Reverse Osmosis System can
give you.
PREPARE SITE EOR INSTAEEATION
1. Before starting, close the hot and cold water shutoff
valves (See Figure 5).
2. Temporarily place tank and filter assembly into cabi
net. Double check position of items and space required
for proper installation.
3. Remove tank and filter from cabinet and set aside.
NOTE: You must check and comply with all local
plumbing codes.
Figure 4
Questions? Call The Kenmore Water Line 1-800-426-9345 or visit KenmoreWater.com