beautypg.com

Running a report – Cisco OL-8620-03 User Manual

Page 8

background image

3-8

Cisco Performance Visibility Manager User Guide

OL-8620-03

Chapter 3 Monitor

Generating Reports Using Monitor

Running a Report

The following procedure uses the Applications report as an example. For samples and descriptions of
individual reports, see the

Appendix B, “Report Samples for Monitor and Reports.”

appendix. For a

complete explanation of available data views and report types, see

Understanding Data Views, page 1-13

in Cisco PVM Overview.

Step 1

Log in to Cisco PVM.

The Overview report runs automatically and appears in the Monitor display pane.

Step 2

Select a report to run by

a.

clicking a suite name in the navigation menu and

b.

selecting the report name from the suite list.

The selected report automatically runs based on the parameters used in the previously run report.

Step 3

Expand the parameters pane by clicking the expansion icon at the right of the Monitor window header. T

The report parameters pane appears.

Step 4

Select the Data Source Group you want to monitor from the drop-down list (see

Figure 3-6

).

Figure 3-6

Select Data Source Group

Step 5

Select the data view you want to see from the drop-down list (see

Figure 3-7

).

Data Source

Drop-down list next to
Data View

Allows you to select the specific data source for the report if the Data
Source view has been selected.

Note

The list defaults to the first data source available in the list for the
NAM or switch selected in the Data Source Group list.

Today

Radio button

Runs the report for all data collected since midnight. [default]

Last

Radio button

Runs the report for the last n hours or minutes.

Note

The historical limit for reporting is the last seven days, but to run
reports going back greater than 24 hours, it is easier to use the
From/To fields.

Auto Refresh

Check box

Refreshes the displayed report at the interval selected in the Last option.

From / To

Radio button with
pop-up calendar icons

Allows selection of a specific set of dates using the calendar icons to
open the pop-up calendar for date selection.

Note

Reports can be run for up to the last seven days.

Refresh

Button

Refreshes the displayed report based on the selected parameters.

Expand/Collapse

Icon

Expands or collapses the Monitor parameters pane.

Table 3-2

Monitor Parameters Pane Field Descriptions (continued)