beautypg.com

4 | compressor assembly – GEA Bock HG4 User Manual

Page 11

background image

D
GB
F
E
I
Ru

11

09958-12.2014-DGbFEIRu

1

2

3

4

5

6

7

8

9

10

11

12

13

1

2

3

4

5

6

7

8

9

10

11

12

13

4.5 Laying suction and pressure lines

INFO!

Proper layout of the suction and pressure lines directly after the
compressor is integral to the smooth running and vibration behaviour
of the system.

ATTENTION! Improperly installed pipes can cause cracks and tears which can

result in a loss of refrigerant,

A rule of thumb:
Always lay the first pipe section starting from the shut-off valve

downwards and

parallel to the drive shaft.

4| Compressor assembly

4.4 Pipes

Pipes and system components must be clean and dry inside and free of scale, swarf and layers of

rust and phosphate. Only use air-tight parts.

Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being

cracked and broken by severe vibrations.

Ensure a proper oil return.
Keep pressure losses to an absolute minimum.

The

pipe connections have graduated inside diameters so that pipes with

standart millimetre and inch dimensions can be used.

The connection diameters of the shut-off valves are rated for maximum

compressor output.

The actual required pipe cross section must be

matched to the output. The same applies for non-return valves.

Fig. 13: graduated
internal diameter

Fig. 14

Rigid
fixed point

As short as
possible