Bradford White M-4-XRTW65T6FSX User Manual
Page 17

17
Venting continued-
TABLE 3
3” (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating #
of
Elbows
Max Straight
Length ft (m)
Min
straight
Length
ft (m)
48,65 gal.
(2) 90
Elbows with (1) 90 Elbow
1 30 (9.1) 5
(1.5)
(2) 90
Elbows with (1) 90 Elbow
2 25 (7.6) 5
(1.5)
(2) 90
Elbows with (1) 90 Elbow
3 20 (6.1) 5
(1.5)
(2) 90
Elbows with (1) 90 Elbow
4 15
(4.6) 5
(1.5)
TABLE 4
4” (10.2 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating (Reduce 4” to 3”)
(Reduce 10.1 cm to 7.6 cm)
# of
Elbows
Max straight
Length ft (m)
Min
straight
Length
ft (m)
48,65 gal.
(2) 90
Elbows with (1) 90 Elbow
1 160
(48.8) 10 (3.1)
(2) 90
Elbows with (1) 90 Elbow
2 155
(47.2) 10 (3.1)
(2) 90
Elbows with (1) 90 Elbow
3 150
(45.7) 10 (3.1)
(2) 90
Elbows with (1) 90 Elbow
4 145
(44.2) 10 (3.1)
(2) 90
Elbows with (1) 90 Elbow
5 140
(42.7) 10 (3.1)
HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,500
FEET (762 m) ABOVE SEA LEVEL
The capacity of the induced draft blower declines with increasing altitude due to
a reduction in the air density. In order to assure safe and reliable performance
of the water heater, contact the supplier for high altitude kit.