Workrite Support Channels User Manual
Assembly instructions for support channels, Parts by carton
#1500127 - Rev B
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
B
#12 x ¾” Screws
Qty: 24 or 48
A
Support Channel
(length differs for each model)
Qty: 1 or 2
Parts by Carton
Assembly Instructions
for Support Channels
Attach Support Channel
If you have only one Support Channel, position it on the longer side of the worksurface,
approximately 4 inches from the back edge.
If you have two Support Channels, similarly position
the second one on the shorter (or other equal) side
of the worksurface, approximately 4 inches from the
back edge.
Be sure all cables between legs are within Channel
and are not trapped under Channel edge, then
attach Channels using screws provided.
1
a
b
Verify that you have all the hardware and tools needed for the assembly
You will also need:
#3 tip Phillips screwdriver or drill bit
or
If the Channel is being attached to the
side that contains the workcenter’s
control box, be sure to attach the
control box first, as close to the back
edge of the worksurface as possible,
to allow room for the Channel.