16 installing second unit, Frame installation – Oldcastle BuildingEnvelope RW-5100 StormMax User Manual
Page 18
STEP 9
install second unit by bringing into position from inside of building and interlocking back legs of
mullion (See Detail C, page 11).
Place appropriate shims beneath sill member to allow for better alignment, and rotate unit inot
place. Plumb and anchor.
Repeate Step 6 for all additional units. Miniumn 1/4” calulk joint at jamb is required for installation
of final unit.
Once all individual frames are secured to the opening, completely seal exterior perimeter with a
continuous bead of Vulkem 921 polyurethane sealant or equal.
16
FEBRUARY 2012
S t o r m M a x R W - 5 1 0 0
TM
I N S T A L L A T I
FRAME INSTALLATION
O N M A N U A L
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com